Leicester Residential Case Study
The Problem
Burst pipe in sub floor in February 2007
The Solution
TES Unit installed because concrete sub floor was wet to the damp proof membrane
The Results
Property declared dry within 4 days of installation. The typical time to complete this job using desiccant dryers and air movers is 14 days. The portability of TES meant it could be used in confined space and on concrete floors and brickwork.
Click Below For More Case Studies
Case Study Residential 1
Insurance Case Study 1
Insurance Case Study 2
“Allkare turned a bad situation into a positive one. Since the flooding to my home Mike’s visit was the only stabilising and reassuring thing to happen to us, Mike went above and beyond to put my home back in shape. We are grateful to Mike for all his efforts.”
Mr & Mrs Williams, Lecicester